User Tools

Site Tools


robots:agsmr:welcome

This is an old revision of the document!


Redesign Project

Shoebox design

look for hub motors

obtional: prepare the design for 4 wheel steering.

Timeplan

????

Deadlines

Ready for exercise/project in ALV in dec-13 or jan-14.

Work done

24.09.13: Design discussion between hwg and cjh.
25.09.13: Start design discussion with Berci.

agSMR

ir sensor Sharp GP2D02 08

robots/agsmr/welcome.1380031444.txt.gz · Last modified: 2021/08/14 04:19 (external edit)